Yay Industry makes the projects, designing and the constructions of your Factory, Industrial Buildings and Constructions, Bussines Centres, Expeditions and Congress Fields and housing and deliver them on time.

By using high tech construction technics and products, we make the projects of earthquake resistant, modern constructions in the way you need and become responsableof the cost exploration and landscape operations. Our understanding of superior structure, becomes united with the perfect underground system and makes the complete constructions.

Total Construction Area: 11.864 m²
Congress Area: 7161,90 m²
Office Areas: 3508,08 m²
Restaurant 1: 402,85 m²
Restaurant 2: 791,18 m²
Excavation: 10.000 m³
Construction Cast: 25.000 m²
Concrete: 7.500 m³
Iron: 600 ton
Mechanical Installation: Plumbing, ventilation, heating and cooling, fire suppression systems, natural gas, central plumbing systems automation.
Electrical Installation: Strong and all manufacturing related to poor whites, grounding, lightning arresters, 1880 KW 1000 KW generator transformer.
Infrastructure: 300mt drainage, 400mt wastewater, 150mt rainwater lines.
Exterior: Sheathing
Landscape Area: 3.000 m²
Hard Landscape Area: 4.500 m²

Total Construction Area: 45.286m²
Main Workshop: 26.436 m²
Transformer Station: 270 m²
Dormitory: 1.500 m²
Repair Workshop 1: 9.282 m²
Repair Workshop 2: 5.346 m²
Paint Workshop: 1.944 m²
Water Test Pump Room: 45 m²
Air Compressor Station: 216 m²
Guard Booths: 160 m²
Wastewater Treatment Station: 90 m²

Residence Construction Area: 33.900 m²
Social Facility: 1.300 m²
Nursery: 380 m²
Mechanical Installation: Plumbing, parking and exhaust ventilation, boiler floor and radiators station, fire suppression systems, natural gas, central plumbing systems automation, fire and potable water tanks.
Electrical Installation: CCTV systems, fire alarm systems, mechanical device automation system, satellite system, internal intercom system digital ground, 5.5 kW power with ambient lighting, decorative lighting, lightning, 3,200 kW and 2090 kW generator transformer.
Infrastructure: Drainage, wastewater and stormwater lines.
Exterior: Sheathing

Total Construction Area: 13.450 m²
Excavation: 30.000 m³
Construction Cast: 27.415 m²
Concrete: 7.265 m³
Iron: 811 ton
Mechanical Installation: Plumbing, ventilation, heating and cooling, fire suppression systems, natural gas, central plumbing systems automation, water tank.
Electrical Installation: Strong and all manufacturing related to poor whites, grounding, lightning arresters, transformer of 500 KW and 500 KW generator.
Infrastructure: 402mt drainage, wastewater 300mt, 130mt rain water lines.
Exterior: Sheathing 1.331 m² – Sandwich Panel 1.130 m²
Hard Landscape Area: 1.610 m²